Skip to content

Fusion and mechanical fiber splicing

How low-voltage installers join fibers in buildings: when a fusion or a mechanical splice fits, preparing cable and fibers for an enclosure, the strip-clean-cleave sequence, what a fusion splicer does and how to judge a finished splice, optimising a mechanical splice with a VFL, protecting and storing splices in trays and closures, checking splice loss in both directions, and keeping glass shards, solvents and the arc under control.

Level
Intermediate
Length
About 60 minutes
Contents
3 lessons · final exam
Status
Published · updated 24 Nov 2026

Skills you'll practise

  • Choose between fusion and mechanical splicing for a building job and explain the trade-offs in loss, reflectance, strength and cost
  • Set up a safe splicing area and prepare cable, buffer tubes and fibers for a closure or splice enclosure
  • Strip, clean and cleave fibers and make fusion and mechanical splices, judging cleaves and finished splices
  • Protect and store splices in trays within bend limits, with strength members clamped and metallic members bonded
  • Check splice loss with bidirectional OTDR results and keep a splice record that others can trust

Course outline

  1. 1.Choosing a splice and setting up to spliceLesson · 18 min
  2. 2.Strip, clean, cleave, spliceLesson · 22 min
  3. 3.Protect, store and verify splicesLesson · 20 min
  4. 4.Fusion and mechanical fiber splicing: knowledge checkKnowledge check · 19 questions
  5. 5.Fusion and mechanical fiber splicing: practical exerciseKnowledge check · 1 question
  6. 6.Final exam10 questions · passing it completes the course, so people who already know the material can test out

Sources it draws on

The lessons and questions are written from these references, so learners can go back to the original.

See it with your own jobs and topics

Tell us about your team and we'll walk you through setup, from choosing jobs to your first skills check.