Coax and RF distribution in buildings
Installing and checking coax RF distribution in commercial and multi-unit buildings: 75 ohm cable types and their listed uses, compression F connectors, splitters and directional taps and the decibel arithmetic that predicts outlet levels, amplifiers, overload and tilt, grounding the coax shield at the point of entrance as the locally adopted code requires, and measuring and recording levels against the design.
- Level
- Intermediate
- Length
- About 60 minutes
- Contents
- 3 lessons · final exam
- Status
- Published · updated 24 Nov 2026
Skills you'll practise
- Choose 75 ohm coax with the right listing for the space and terminate it with compression F connectors
- Calculate expected signal levels through cable, splitters and taps in dB and dBmV
- Choose and place directional taps so outlets fall inside the design window
- Recognise amplifier overload and cable tilt from readings and choose a fix that follows the design
- Describe how the coax shield is grounded at the point of entrance and when to involve the electrician or AHJ
- Measure outlet levels and record them against the design
Course outline
- 1.Coax cable and connectorsLesson · 18 min
- 2.Splitters, taps and level arithmeticLesson · 22 min
- 3.Amplifiers, tilt, grounding and level checksLesson · 20 min
- 4.Coax and RF distribution in buildings: knowledge checkKnowledge check · 19 questions
- 5.Coax and RF distribution in buildings: practical exerciseKnowledge check · 1 question
- 6.Final exam12 questions · passing it completes the course, so people who already know the material can test out
Sources it draws on
The lessons and questions are written from these references, so learners can go back to the original.
- Wikipedia: RG-6 (75 ohm characteristic impedance; generic name for many designs; usually an 18 AWG centre conductor; attenuation proportional to length and rising with frequency)
- Wikipedia: F connector (threaded 75 ohm connector used with RG-6 and RG-59; compression fittings are near-standard practice; push-on connectors shield worse; F connectors aren't weatherproof without seals)
- Wikipedia: Power dividers and directional couplers (passive devices; directional couplers provide taps for cable distribution systems; coupling, insertion loss and isolation)
- SCP RG6/UQ-BC-WT quad-shield coax specification sheet (as published by a distributor): 75 ±3 ohm, 18 AWG centre conductor, attenuation per 100 ft rising from 2.05 dB at 100 MHz to 6.60 dB at 1000 MHz, velocity of propagation 85%
- On-Q/Legrand VM2202-V1 2-way splitter specifications (as published by a distributor): 75 ohm, 5–1525 MHz; maximum insertion loss 3.5 dB at 5–40 MHz rising to 4.2 dB at 751–1002 MHz; typical 3.3–3.8 dB across 5–1002 MHz; return loss by band
- Blonder Tongue SRT series indoor directional taps (manual page): 1 GHz taps for educational, correctional, commercial and multi-dwelling systems, 2, 4 or 8 tap ports, tap values from 4 dB to 35 dB in 3 dB steps depending on model
- Linear ChannelPlus DA-500A RF distribution amplifier manual (as published by a distributor): herringbone patterns are intermodulation distortion, most often from an over-driven amplifier; test with a variable attenuator before the amplifier; traps or filters for strong local signals
- Linear ChannelPlus TC-200A tilt compensator instructions (as published by a distributor): coax attenuates high frequencies more than low; the compensator adds equal and opposite loss for 200 ft of RG-6 ahead of an amplifier
- EC&M Code Basics (Mike Holt): Article 820, Community antenna TV and radio distribution systems (summary of an NEC edition: support, abandoned cable, firestopping, separation, grounding the shield close to the point of entrance with a short, straight conductor, bonding a separate electrode, CATV/CATVR/CATVP listings)
- NFPA 70, National Electrical Code (Article 820 covers community antenna TV and radio distribution; follow the edition and amendments your jurisdiction adopted)
- General low-voltage installation practice (starter content; needs subject review)
See it with your own jobs and topics
Tell us about your team and we'll walk you through setup, from choosing jobs to your first skills check.